How we work
A clear path from first conversation to production.
Four phases, each with a fixed scope, named deliverables and a decision point. You can stop after any phase and keep everything we produced.
The four phases
Fixed scope, named deliverables, a decision at every step
Durations are typical targets and depend on scope and system access.
01Discover
2–3 weeks (typical)
Process walk-throughs, system and data access review, baseline measurement, use-case scoring and EU AI Act classification.
You receive
- Opportunity map
- Baseline report
- Pilot charter with success criteria
- Architecture & security outline
Decision point: Go / no-go on the pilot
02Pilot
6–10 weeks (typical)
One process, live data, read and write integration, confidence thresholds. Shadow mode first, then supervised mode.
You receive
- Working automation
- Results against baseline
- Control documentation
- Runbook
Decision point: Scale, adjust or stop
03Scale
1–6 months (typical)
Extend to more entities, plants or sites. Production hardening: monitoring, alerting, DR, access reviews, validation completion.
You receive
- Production release
- Validation or control evidence
- Process-owner training
Decision point: Hand over or operate
04Operate
Ongoing (typical)
Managed service: drift monitoring, threshold tuning, regression testing on ERP updates, quarterly value reviews.
You receive
- SLA reporting
- Value dashboard
- Roadmap
Decision point: Expand the roadmap
Principles
How we keep AI calm and controlled
Baseline before build
We measure volumes, touch time and error rates before we write a line of code, so results are compared with something real.
Shadow mode before autonomy
Automation first runs alongside your team without acting. Thresholds are raised only when the evidence supports it.
Your data, your environment
EU or US hosting, or your own cloud tenant. Subprocessors and model endpoints are documented before the pilot starts.
No lock-in
Code, prompts, configuration and documentation are handed over. If you run it yourself later, you can.
Team
A small senior team on every engagement
You work with the people who design and build the automation, not a pyramid of junior staff.
Engagement lead
Owns scope, success criteria and the decision points with your sponsor.
Solution architect
SAP or Oracle specialist. Designs the read/write integration and the control model.
ML engineer
Builds, evaluates and monitors the models, including drift and confidence calibration.
Domain lead
Finance, operations or quality practitioner who speaks your process owners' language.
[Team bios and headshots to be supplied]
Commercials
Commercial models
Each phase is priced and agreed on its own. Pricing depends on scope and is discussed in the first consultation.
- Fixed fee
- Discovery
- Fixed scope, fixed fee
- Pilot
- By milestone
- Scale
- Managed-service subscription
- Operate
[Verify commercial models with Zen EcoAI leadership]
FAQ
Engagement questions
What do you need from us to start a pilot?
A process owner with a few hours a week, read access to the relevant data in a test or production-like system, and a technical contact for integration and security review.
What if the pilot doesn't meet the success criteria?
We report the results against the baseline as they are, explain why, and recommend whether to adjust or stop. Stopping is a valid outcome, and you keep all deliverables.
Can our own team take over after go-live?
Yes. We include handover documentation and training in the Scale phase. The managed service is optional.